Fresh-up course
Target group: Maintenance personnel
Prerequisite: Proper skill for this job, resp. training as skilled worker or corresponding knowledge
Kind of training: Theoretical training
Time period: approx. 2-3 days
Training location: SMS group classroom training
Training timing: 1-2 years after commissioning of the machine resp. in agreement with the customer
Program
- Basics
- Daily dealing with the documentation of the ring rolling machine
- Operating manual for machine operation
- Operating manual for machine maintenance
- Structure of the assembly and production drawings
- Structure of the hydraulic diagrams
- Handling of the spare parts list
- Sub-supplier information
- Practical maintenance
- Tasks and methods of maintenance
- Correlation between ring quality and machine condition
- Preventive maintenance
- Structure of a machine-specific maintenance plan (daily, weekly, at longer intervals)
- Maintenance of the machine
- Machine cleaning
- Elimination of leakages
- Control and adjustment of set values
- Maintenance of the accumulators
- Inspection
- Control and possibly replacement / refill of operating fluid
- Control and possibly replacement of filter elements
- Performance data control
- Detection of inner leakages
- Noise test for mechanical / hydraulic components
- Nitrogen pressure control of the accumulators
- Control of the safety valves and accumulators
- Control of the air or water cooler
- Control of the guides and the guiding clearance
- Control of the wear condition of the tools
- Corrective maintenance
- General advice
- Replacement of wear and spare parts
- Repairs and recommendations
- Recommendations for spare parts stockpiling
- Necessary information for spare parts orders
- Malfunctions
- Trouble-shooting, reasons and clearance
- Advice for setting-up a malfunction database