High-capacity steelmaking
The steelmaking plant of SDI is equipped with two direct-current electric arc furnaces (DC-EAF) having a capacity of 190 tons (210 short tons) each and two twin ladle furnaces (LF) and a double vacuum tank degasser (VD).
Main data
- 190 tons: Ladle size of each of the two Electric Arc Furnaces
- 2 twin ladle furnaces
- 45 minutes: Minimum tap to tap time to provide a ladle with liquid steel
Share this project
Tags
問合せ先